Getting a fleet onto an island is the easy half. Keeping it running once the ship has gone, with no workshop network behind it and parts a fortnight away, is the problem worth solving.
The problem
Operators across the Pacific were taking delivery of equipment specified for mainland conditions and mainland support. Units arrived incomplete, were commissioned on the dock, and the first fault became a procurement exercise rather than a repair. Spare parts were not interchangeable between deliveries, and the people maintaining the assets had never seen them before they landed.
What we did
ALSR took the whole program onto one floor in Newcastle: design, fabrication, fitout, branding and pre-deployment testing. Every unit left the building complete, numbered and reconciled against the destination it was bound for, with the spares and documentation packed alongside it.
- A single specification, prototyped on the bench and signed off before the run started
- Production in batches matched to each operator’s shipping window
- Compliance branding and asset identification applied in-house, unit by unit
- Telematics fitted and commissioned before dispatch, so assets reported from the day they landed
- Local operators trained on the build they would be maintaining, not a generic equivalent
Changes mid-run were built into the final product as part of the process, not a shipping container of an outdated product.
Where it landed
The fleets are in service across several island operators, supported on a planned interval rather than on failure. Because the specification is held in one place, a fault found on one island is understood everywhere, and an upgrade can be scheduled into the maintenance cycle instead of requiring another shipment.